News
10.11.2025 The work of the Matkiv AMS has been resumed
01.10.2025 Installation of water quality sensors on 3 AMS
27.09.2025 Participated in the installation of surface water quality analysis stations on the Ingulets River
12.07.2025 Installation of the Dragobrat AMS was carried out
10.01.2025 Installation of 4 AMS at water reservoirs
10.12.2024 Installation of 4 hydrological AMS was carried out
10.11.2024 Repair of the Stryi, Pasichna, Yaremche, Guta AMS was carried out
20.10.2024 Repair of three Volyn AMS was carried out
21.09.2024 Repair of the Chernivtsi AMS was carried out
28.02.2024 Repair of the Khrinnyky AMS was carried out
01.07.2023 An audit of the Prikapattia and Pripyat AMS was carried out
20.09.2012 In the Pripyat River basin were installed three AMS
18.05.2012 In Belarus was installed the second AMS
28.11.2011 In Belarus was installed the first AMS
12.10.2011 Another station was installed
11.02.2011 On the river Stir in Lutsk (Ukraine) was installed the first automated measuring station


